Millennium Marine Contractors were hired as the main contractor for the Haldon Pier Project at Torquay. Phase 1 was for the reinstatement of harbour wall with concrete filled bags placed with dowels and interspersed with grout was then filling ports. Specialist grout pumped under pressure to fill void behind. Phase 2 included below water reinstatement of separate 1200 x 1200 concrete blocks by means of individual shuttering and mass pouring of a specialist concrete mix. Additional areas were finished with sprayed concrete at low tide.