Video Post Pile Repairs & Extensions, Torquay
wavo2015-02-24T23:10:03+00:00Pile Repairs Torquay Video.
Pile Repairs Torquay Video.
Millennium Marine Contractors were awarded the contract to install a timber and rubber fendering system to the working fish quay [...]
Millennium Marine Contractors were hired by Torbay Council as the main contractor for the seawall repairs at Meadfoot in Torquay, [...]
Millennium Marine Contractors were hired by Torbay Council as the main contractor for the seawall repairs at Meadfoot in Torquay, [...]
Millennium Marine Contractors were hired by Torbay Council as the main contractor for the seawall repairs at Meadfoot in Torquay, [...]
Millennium Marine Contractors were hired by Goulden and Sons Ltd for Espalier Developments Ltd in June 2013 to undertake work [...]
Millennium Marine Contractors were hired by Sutton Harbour Company Ltd for the White House Pier Project in Plymouth. In 2009 [...]
Millennium Marine Contractors were hired by Marina Developments Ltd to complete a project on Torquay Marina. The work included welding [...]
In March and April 2007 Millennium Marine Contractors Ltd were contracted by Torbay Council to complete a two phase repair [...]
Millennium Marine Contractors have completed many sea wall repairs using grout to infill voids and cracks within the structure. A [...]
In February 2006 Millennium Marine Contractors Ltd completed phase 2 scour repairs at Blue Anchor Bay near Minehead Somerset. The [...]
Millennium Marine Contractors were hired as the main contractor for the Haldon Pier Project at Torquay. Phase 1 was for [...]
Millennium Marine Contractors were hired for the salvage work of a Zuiderkruis Storage barge at Brixham Harbour.
Millennium Marine Contractors were the main contractor hired by Torbay Council to design, build and install a new board house [...]
Millennium Marine Contractors were hired by South West Highways and overseen by the Environment Agency, and were for the underwater [...]
Millennium Marine Contractors were hired by the Hope Cove Harbour Commissioners to repair the breakwater.
In February 2007 Millennium Marine Contractors Ltd were contracted by May Gurney Ltd to complete the phase two repairs on [...]
Millennium Marine Contractors were hired by Dart Harbour and Navigation Authority for the salvage of the Ketch Rebel on the River [...]
Millennium Marine Contractors were hired by the Environment Agency to survey, ultrasonic thickness readings were taken and a report was compiled on [...]
Millennium Marine Contractors were hired by the Environment Agency for the underwater inspection and repairs to the running track at [...]
Millennium Marine Contractors are hired on an annual development by Marina Developments Ltd for the initial survey and report of damaged [...]
Millennium Marine Contractors were hired by Mowlem Civil Engineering for Poole Borough Council for repairs to Poole Harbour Lifting Bridge. [...]
Millennium Marine Contractors were hired by the Island Cruising Club for the reconstruction of their slipway at Baston Creek, Salcombe.
Millennium Marine Contractors were hired by Salcombe Harbour Authority for the flood defense repairs at Salcombe in Devon.
Millennium Marine Contractors were hired by Torbay Council to repair the Victoria Breakwater and Brixham in South Devon. We used [...]
Millennium Marine Contractors were hired by Dyer and Butler . On both sides of the River Dart new slipways were constructed [...]
Millennium Marine Contractors offer a spud leg barge with crane and solidarity. Our category 3 workboat with CCTV and two [...]
Millennium Marine Contractors were hired by John Pavit Engineers Ltd for Nexfor Ltd to carry out repairs to the fresh [...]
Millennium Marine Contractors were hired by T J Brent for the installation of storm outfall at Brixham Harbour.
Millennium Marine Contractors were hired by the MOD for the search and recovery of a 5 tonne submarine fender.
Millennium Marine Contractors were hired by Harbour Authority to recover a sunken vessel from the seabed in Brixham.
Millennium Marine Contractors were hired by Dart Harbour & Navigation Authority to Recover a damaged vessel from the seabed in [...]
Millennium Marine Contractors were hired by China Clay for the installation of discharge pipeline anchor.
Millennium Marine Contractors were hired by May Gurney Utilities (formally T J Brent) for the removal of steel work and [...]
At Millennium marine Contractors we have fully trained personnel that are equipped with and trained in the latest in CCTV [...]
At Millennium marine Contracts our crane barge is MCA certified and has dimensions of: 13.5M x 6.5M. It has a [...]
At Millennium marine Contracts we off a Lightweight Support Boat service. The support boat is a road transportable 8 metre [...]
At Millennium Marine Contractors we have extensive in-house drawing and CAD capabilities at our office in Heathfield, Newton abbot, which [...]